When a job misses its margin, the first questions usually go to operations.
Why did buyout come in high? Why was the scope missed? Why didn’t the PM see the problem earlier?
Those questions need answers. So does this one: what did the project team inherit?
A budget can look complete while leaving important assumptions unexplained. The estimate goes out the door. Operations takes over. Then the argument starts about what the number was supposed to cover.
In my conversation with Hamid Hajian, Founder and CEO of Zebel, we discussed what excellent preconstruction requires. The useful lessons go beyond software. They concern accountability, knowledge, judgment, and how your people work together.
Listen or Watch the Episode
1. Make responsibility for the estimate clear
The head of preconstruction is accountable for the overall estimate. That doesn’t remove individual responsibility for the work inside it.
On a large project, several people may develop different parts of the budget. Someone handles concrete. Someone else handles MEP or sitework. Each person needs to understand and stand behind their portion.
Ask your precon leader: who can explain the basis of each major cost item?
If the answer is vague, the estimate may contain numbers without clear ownership. Before it leaves the department, your team should know who developed each major number, what information supported it, and which assumptions remain unresolved.
2. Turn cost history into information people can use
Hamid describes experienced estimators as “walking databases.” They remember the jobs, the pricing, and the reasons a cost changed.
That experience is valuable. It also creates a dependency when the rest of the team must ask the same person every time it needs context.
Start by making past project information comparable. Use consistent cost codes and descriptions. Agree on the units your team uses. Record what you budgeted and what you actually spent.
Then explain the differences that matter.
Suppose an estimate carried carpet at four dollars per square foot and the final cost was six. That’s an example Hamid uses in the conversation. The next estimator needs more than the two numbers. Did the scope change? Was the original assumption wrong? Did something happen during the job that shouldn’t be carried into the next comparison?
Your team doesn’t need a perfect knowledge-management system before it starts. Pick one completed project and document the lessons behind its largest cost differences. Repeat that work consistently.
3. Develop estimators who can explain their judgment
A great estimator understands the project, its scope, and its difficult parts. They can explain how the available information led them to a number.
That matters because estimating develops alongside the design. Early estimates rely on assumptions. As better information arrives, the team replaces those assumptions with facts and revises the estimate.
At any stage, someone should be able to explain what is known, what is assumed, and what could change.
Develop that ability deliberately. Ask junior estimators to walk you through a major cost item. Give them opportunities to see how the work gets built. Have experienced people explain why they questioned a number or chose a particular comparison.
You learn more about an estimator’s development by asking them to explain a decision than by checking whether their spreadsheet totals correctly.
4. Bring operations into the estimate before the handoff
One of Hamid’s most useful points concerns the people who will eventually buy out the work.
Bring them into the process early, particularly on the major cost drivers.
They’re going to question the budget eventually. Give them a chance to do it while the estimate is being developed, when their experience can improve the assumptions.
That doesn’t require every PM to attend every estimating meeting. Start with the items that represent the largest financial exposure or greatest uncertainty on that project.
Ask the people responsible for procurement and delivery to review the scope, pricing basis, and risks. Resolve disagreements or document what still needs to be settled.
By the time the formal handoff arrives, operations should already understand the important decisions. The handoff can then focus on executing the plan and managing remaining uncertainty.
5. Give AI a useful job and keep people accountable
Hamid sees useful applications for AI in cleaning up information and checking work. He also cautions against expecting it to make experienced judgment calls on your behalf.
That’s a useful distinction for a construction leader evaluating new tools.
There may be value in helping your team organize historical estimates, identify inconsistent data, or flag something that deserves another look. Someone with the right experience still needs to evaluate the result and decide what it means for the job.
Start your technology conversation with a specific problem. Is your team spending too much time finding past costs? Is inconsistent data making comparisons difficult? Does preparing an early estimate take longer than your clients can tolerate?
Define the problem, test whether the tool helps, and keep responsibility for the final estimate clear. A better interface won’t resolve an argument about who owns the number.
Review one handoff this week
Get your preconstruction and operations leaders together. Choose one recent project and ask:
- Can the project team explain the assumptions behind the major costs?
• Did the people responsible for buyout help develop those numbers?
• What did actual costs teach us that should change the next estimate?
Listen carefully to where the answers differ. That’s where the work begins.
Excellent preconstruction gives your people a clearer understanding of what they’ve committed to and what it will take to deliver the job profitably.
Listen to my full conversation with Hamid Hajian: https://constructiongenius.com/preconstruction-project-profit/
Learn more about Zebel: https://zebel.io/
To develop the leaders responsible for making these conversations productive, explore The Shift: https://theshift.constructiongenius.com/
About the Guest
Hamid Hajian is the Founder and CEO of Zebel, a preconstruction platform built for general contractors and developers. He grew up around his family’s real estate development business and trained as a civil engineer before working in construction and preconstruction. His experience includes managing preconstruction at Western National Group and leading technology adoption at EnTech Engineering in New York City. He bootstrapped Zebel with support from friends, family, and customers. Hamid holds a B.S. in Civil Engineering from Shiraz University, an M.S. in Construction Management and an Engineer degree in Construction Information Technology from USC, and an MBA from the Wharton School of the University of Pennsylvania.
Connect with Hamid Hajian
Zebel: https://zebel.io
Subscribe and Review
Subscribe to Construction Genius on YouTube, Apple Podcasts, or Spotify. Leave a rating and a review so other contractors can find the show. And visit constructiongenius.com for more on leading your company.
- YouTube. https://www.youtube.com/@EricAndertonConstructionGenius
- Apple Podcasts. https://podcasts.apple.com/us/podcast/construction-genius/id1450374691
- Spotify. https://open.spotify.com/show/4lfMWIeTw7PyuBJLbIbFoI
- Website. https://constructiongenius.com
👉 More from Construction Genius
- 📘 Get the book Construction Genius:https://www.amazon.com/Construction-Genius-Effective-Hands-Leadership/dp/B0BHTRDY1T/
- 🧠 Learn about The Shift: Construction Leadership Course